All Staff
Please pray for Paul Kelm and Jared Brennan as they deliberate the two calls they now hold.
There are several building updates taking place between February 13 and February 17
Room 133
Wall Demolition - 13
Slight Asbestos Abatement to the ceiling that will allow anchors for the drop ceiling to be installed - 17
New locks throughout the school - 13 & 14
These will be primarily keyed to 20 AA
Concessions, AD, and Elevator will be on a different lock
All new locks will be able to be opened with the master key (AA)
A point-of-use water heater & faucet will be installed in the 1st-grade room - 13
A plumber will be in at 3:30 PM on February 13 to discuss how a recirculation pump can solve the problem of hot water to the kitchen and Lower Level bathrooms
Faculty
National conference registration is now open. Please go to the WELS Ed Conference website.
Use the Code FVLSCHOOLS at checkout. This will then zero out the balance
Email me your completed registration
Articles for the March Eagle are due on February 25
I created a process document for the interview team, located here.
Staff out of the building this week
Important Links
In His Grace,
No comments:
Post a Comment